SPIC Xinjiang Turpan Shanshan Qiketai 100MW CSP project
Second batch of large-scale scenic base projects in Xinjiang
100MW CT CSP and 900MW PV
100MW CT CSP and 900MW PV
Project Overview
The project, located in Qiketai Town, Shanshan County, Turpan City, Xinjiang Uygur Autonomous Region., has a total installed capacity of 1GW including 900MW PV and 100MW CT CSP. Two 220KV substations will be built.
Cosin Solar won the bid for the Solar Field and MSR System engineering and equipment supply for the 100MW CSP part out of the project.
Parameter Introduction
Installed Capacity
100MW
Storage
12 Hours with Molten Salt
Land Area
1.86km²
Solar Field Reflective Area
500,010m²
Heliostat Numbers
16,667
Distance from Ground to the Center of Receiver
210m
Electrical Output
103 GWh/year